105年度高鐵營運定期檢查辦理紀要 Summary of the 2016 Annual Inspection on HSR Operations
定期檢查啟始會議聽取簡報。

交通部鐵路營運監理小組於105年5月18日起開始執行105年度高鐵營運定期檢查作業。年度定期檢查係依據鐵路法第41條及「地方營民營及專用鐵路監督實施辦法」第47條規定之檢查事項,包括「組織狀況」、「營運狀況」、「財務狀況」、「工程狀況」、「行車安全管理」、「機車、車輛檢修狀況」、「路線修建養護狀況」及「其他有關事項」等8大類。本年度有關「財務狀況」因另有查察機制,預定105年6月底起辦理年度「高鐵計畫營運期財務查核」。
本次檢查作業由鐵路營運監理小組呂副總工程司新喜率相關同仁赴台灣高鐵公司南港總公司聽取簡報後,各分組分赴該公司運務維修大樓、各車站及基地等場所進行文件檢視、人員洽詢及現場查察。查察內容包括各檢查項目之制度執行狀況及實際作業報表與紀錄等文件之抽查檢視。其中,針對南港車站預定105年7月1日營運通車,以及因應核心機電系統設備使用年限所採取措施等,特別查察其辦理情形。
本年度檢查項目共計117項,分為營運組、土建組、機電組及勞安衛組等4個分組執行查察,檢查作業已於105年5月30日順利完成。後續將依檢查結果撰擬檢查報告,並依法提出應行改進事項,簽報交通部核可後函請台灣高鐵公司辦理改善。

On May 18, 2016, MOTC Railways Supervision Task Force commenced the 2016 Annual Inspection on HSR Operations. The inspection was carried out based on regulations in Article 41 of “Railway Act” and Article 47 of “Regulation for Supervision of Local Railway, Private Railway and Exclusive Railway”. The eight major inspected items included Organization, Operational Situation, Financial Situation, Constructions, the Safety Management System, Maintenance of Trains, Maintenance of Tracks and Others. Regarding item “Financial Situation”, it will be processed through an additional regulation mechanism called “HSR Operation Financial Inspection” which is scheduled to commence around end of June 2016.
This inspection was implemented by Railways Supervision Task Force with Deputy Chief Engineer Hsin-Hsi Lu leading the team. First, the party arrived at THSRC headquarters in Nangang for briefing. Then, the sub-teams went on separately to the operation maintenance building, stations and bases for document examination, staff questioning and on-site inspection. Inspection contents included actual enforcement of policies, regulations and procedures and also random checks on data sheets and records. Among the inspected items, Nangang Station that is scheduled to officially operate on July 1, 2016 and response measures for the service years of the corresponding core E&M system equipment were especially examined in this annual inspection.
The annual inspection was completed by May 30, 2016 in which total of 117 items were reviewed including 4 categories: Operation, Civil Engineering, Electric & Mechanic and Labor Safety & Health. An official report based on inspection results will be provided and improvement items will be generated according to law. The report will be ratified by MOTC and submitted to THSRC for future improvements.