機場捷運安全衛生稽查作業概述 Summary of the TIAA MRT Safety and Health Inspection Operations
105年第3季CM01區段標安衛定期稽查併同勞檢單位聯合稽查/外業稽查。

機場捷運工程兼具地下段與高架段,路徑通過市區、穿越山嶺及桃園機場塔台下方,因工程複雜、施工難度及風險高,故工安意外災害發生機率亦相對提高,為消弭工安意外事故的發生進而達到降災、減災目標,爰依據本局安全衛生管理體系及權責劃分,訂定安全衛生稽查作業標準,並執行機場捷運安全衛生稽查作業,俾利工程施工期間督促監造要求廠商落實執行安全衛生自主管理。
依安全衛生稽查作業之稽查性質,分為定期稽查、不定期稽查及平時稽查三種。其中定期稽查由本局捷運工程處每3個月對所屬之工程標案辦理1次稽查,主要對象為監造單位及施工廠商,檢查項目為內業文件及外業現場安全衛生,受稽單位最後依稽查委員意見於期限內完成缺失改善事項,並陳報安衛稽查小組結案。
不定期稽查:工程處依工程現場發生工安事故之情節輕重或上級交辦事項及臨時任務與自主能力較薄弱且有風險較高之施工廠商,不限定標段由相關單位派員組成稽查小組辦理不定期稽查作業,並視工地實際需求隨時啟動稽查機制。
平時稽查則由督導工務所(或工程隊)依品質查證作業標準規定,以品質查證方式每月對所屬之各標工程辦理1~2次平時稽查作業。
工地安全衛生稽查作業,主要是強化機場捷運工程工安管理,推動工程風險管理,落實工安管理現場化,並適時制定各項施工標準作業程序,以有效預防施工階段之職災強化承攬管理機制,以提升施工單位安全衛生自主管理觀念,並秉持「生命無價、以人為本」的原則,重視勞工生命安全及強化所有施工人員之安全觀念,將職業災害降至最低點,創造工程安全新形象,保障勞工施工安全,使工安朝向零事故方向向前邁進,創造業主及施工廠商雙贏局面。

The TIAA MRT project has both underground sections and elevated sections. The route passes through the urban areas, mountains and under the Taoyuan airport tower. Due to the complexity of the project, the construction difficulty and the risk, the accident occurrence rate of industrial accidents is relatively higher. In order to eliminate accidents to achieve disaster reduction objectives, project authorities had set safety and health inspection standards according to BOHSR safety and health management system and the division of powers and responsibilities, and also implemented safety and health inspection operations on the TIAA MRT project in order to supervise during the construction period and demand constructors to implement self-management of health and safety.
In accordance with the audit nature of the safety and health inspection operations, it is divided into regular inspection, random inspection and usual inspection. Among the inspections, the regular inspection is implemented by the MRT Engineering Office every three months with the main target being the supervision of units and construction companies. Inspection items are construction documents and on-scene field safety and health, and in accordance with the views of the audit committee members, auditee unit will complete improvement and missing matters within the time limit and report back to the safety and health inspection team to close the case.
Random inspection: the MRT Engineering Office will implement the inspection in accordance with the seriousness of the accident at the construction site, matters assigned by superiors, temporary tasks or contractors with lesser independency and higher risks. The inspection team shall be sent by relevant units, not limited to certain tender or section, to carry out random inspection work and start the inspection mechanism at any time according to the actual demand of the site.
Safety and health inspection operations on construction sites is mainly to strengthen the TIAA MRT project safety management, promote project risk management, implement on-the-scene safety management and timely development of the construction of standard operating procedures to effectively prevent disasters in the construction phase and enhance contract management mechanism. The inspection operations will also enhance the concept of self-management of safety and health in construction units, uphold the principle of “life is priceless, people-oriented”, value labor safety and strengthen the safety concept of all construction workers to minimize occupational hazards, create a new image of engineering safety, ensure the safety of labor construction, move towards the direction of zero-accidents in construction safety and ultimately create a win-win situation for owners and construction companies.

  • 105年第1季CM01區段標安衛定期稽查/內業稽查。
  • 105年第1季CM01區段標安衛定期稽查監造及廠商簡報。