Newsletter 高速鐵路簡訊 . 交通部高速鐵路工程局
106年12月份大事紀要 December Major Events 2017

12.04
胡局長湘麟主持「高雄環狀輕軌捷運建設計畫第五次修正計畫書」初審會議,邀集行政院相關機關及交通部相關單位,會議結論請高雄市政府依與會單位所提意見檢討修正計畫書後函送交通部續審。
Director-General Hsiang-Ling Hu hosted the initial review of the “Fifth Revision of the Circular Line of Kaohsiung Light Rail Project” and invited relevant departments of the Executive Yuan and MOTC. The meeting concluded that the Kaohsiung City Government shall revise the report according to comments raised by participating units and submit to MOTC for secondary review.

12.06
胡局長湘麟主持機場捷運DU03標A14車站建築造型簡報會議。
Director-General Hsiang-Ling Hu hosted the briefing of architectural design in A14 Station of the TIAA MRT DU03 Tender.

12.13
楊副局長正君主持106年度臺鐵定期檢查結果會議。
Deputy Director-General Cheng-Chun Yang hosted the 2017 TRA Annual Inspection Results Meeting.

12.13
鍾總工程司維力主持「交通部高速鐵路工程局通用化無障礙交通環境小組」106年度會議。
Chief Engineer Wei-Li Chung hosted the 2017 annual meeting of the “BOHSR General Accessible Transportation Environment Ad Hoc Group.

12.18
胡局長湘麟率員出席行政院吳政務委員澤成主持之「交通建設及前瞻計畫產業媒合與促參推動平臺會議第3次會議」。
Director-General Hsiang-Ling Hu led associates to attend the “3rd Meeting of the Matching and Promotion of Private Participation Platform of Transportation Construction and the Forward-looking Infrastructure Program” hosted by Minister without Portfolio Tse-Cheng Wu of the Executive Yuan.

12.22
鍾總工程司維力主持「高雄都會區大眾捷運系統都會線(黃線)建設及周邊土地開發計畫可行性研究」初審會議,邀集行政院相關機關及交通部相關單位,會議結論請高雄市政府依與會單位所提意見檢討修正計畫書後函送交通部續審。
Chief Engineer Wei-Li Chung hosted the initial review of the “Feasibility Study of Kaohsiung Mass Rapid Transit Metro Line (Yellow Line) of the Metropolitan Area Construction and Surrounding Land Development Project” and invited relevant departments of the Executive Yuan and MOTC. The meeting concluded that the Kaohsiung City Government shall revise the report according to comments raised by participating units and submit to MOTC for secondary review.

12.23
胡局長湘麟率局、處同仁辦理由副總統陳建仁主持嘉義市區鐵路高架化計畫先期工程動土典禮,交通部長賀陳旦、嘉義市長涂醒哲及民意代表等均應邀到場觀禮。
Director-General Hsiang-Ling Hu led associates to implement the Groundbreaking Ceremony of the pre-project construction of the Chiayi Urban District Elevated Railway Project that was hosted by Vice President Chien-Jen Chen. Officials including MOTC Minister Hochen, Tan, Chiayi City Mayor Shiing-Jer Twu, Chiayi County Magistrate Hwa-Kuan Chang and elected representatives were also invited to the ceremony.

12.26
胡局長湘麟主持高鐵延伸屏東新闢路線可行性研究案期末簡報會議。
Director-General Hsiang-Ling Hu hosted the Final Briefing of the HSR Pingtung Extension Line Feasibility Study.

12.27
胡局長主持「臺南市先進運輸系統第一期藍線可行性研究報告書」初審會議,邀集行政院相關機關及交通部相關單位,會議結論請台南市政府依與會單位所提意見檢討修正計畫書後函送交通部續審。
Director-General Hsiang-Ling Hu hosted the initial review of the “First Phase Blue Line of Advanced Transport System in Tainan City Feasibility Report” and invited relevant departments of the Executive Yuan and MOTC. The meeting concluded that the Tainan City Government shall revise the report according to comments raised by participating units and submit to MOTC for secondary review.

12.27
鍾總工程司維力率隊參加「交通部無障礙交通環境推動小組」106年度第2次委員會議。
Chief Engineer Wei-Li Chung led associates to attend the 2nd committee meeting of “MOTC Accessible Transportation Environment Promoting Ad Hoc Group” in 2017.

12.29
胡局長湘麟主持地層下陷防治專案小組106年度第2次專案小組會議。
Director-General Hsiang-Ling Hu hosted the 2nd meeting of the HSR Alongside Land Subsidence Prevention Ad Hoc Group in 2017.

12.29
機場捷運A8共開大樓完成產權移轉登記作業。
The Co-developed Building in TIAA MRT A8 Station completed its property transfer registration operation.

  • 分享: